Full kitchen renovations
Demolition to the last cabinet handle: layout, cabinets, quartz or laminate counters, backsplash, lighting, flooring and the appliance hookups, sequenced so the electrician is not waiting on the countertop templater. One contract, one schedule, one person answering the phone.
Full bathroom renovations
Taken down to the studs, framed square, waterproofed with a Schluter-KERDI or equivalent membrane that is flood tested before any tile goes on, and vented to the outside as the Ontario Building Code requires. Rebuilt with the vanity, tile and fixtures you actually chose, not whatever the supplier had on the shelf.
Design, layout & selections
Measured drawings and a 3D layout so you can see the island, the sightlines and where the fridge door swings before anything is ordered. We walk you through cabinet lines, counters, tile and fixtures with a decision deadline for each, because the schedule only holds if the choices are made before demolition.
Cabinets & countertops
Custom, semi-custom or IKEA cabinets installed level and plumb on shimmed bases, with quartz, granite or laminate counters templated after the boxes are set so the seams and overhangs come out right. Soft-close hardware, filler strips and toe kicks fitted so nothing looks like it came out of a flat pack.
Plumbing & electrical relocation
Sinks moved, islands wired, gas ranges piped, dedicated circuits for the fridge and dishwasher, GFCI protection at the counter and pot lights on dimmers, all done by our licensed plumber and ECRA/ESA licensed electrical contractor. The ESA notification and the plumbing permit are filed and inspected before anything gets drywalled over.
Walk-in showers & accessible bathrooms
Tub-to-shower conversions, curbless entries, linear drains, hand-held sprays and blocking in the walls for grab bars, so the bathroom works for a parent moving in or a knee that is not what it was. Comfort-height toilets, wider doorways and slip-rated tile are planned into the layout, not bolted on later.
Wall removal & open concept
Load-bearing walls between kitchen and living room opened up with an engineered LVL or steel beam, temporary shoring while it goes in, and an engineer's letter and building permit for the file. Floors patched and ceilings blended so it looks like the house was always that way.
Permits & inspections
Municipal building permit for structural, plumbing and layout changes, ESA notification for the electrical, and every inspection booked and met by us. You get the closed permit and the ESA Certificate of Acceptance for your records, which is what a buyer's lawyer asks for later.