TradeForge demoTry it 48 hours free

Framing Carpenter · Milton

Framing carpenters in Milton

Additions, roofs, beams, decks and structural repair. Studline Framing will frame to the stamped drawings, meet the inspector, and leave it square for every trade after.

Serving Milton

Licence 7A-86166 · 13 years in the trade · Same day where we can

About

About Studline Framing

Studline Framing will frame the part of the house nobody ever sees again, which is exactly why it is worth doing properly. Walls plumb, floors flat, trusses braced the way the truss drawings say, nailing patterns the inspector can count. We work from stamped drawings on anything structural, we shore before we cut, and we hand the job over square so the drywall and cabinet crews are not fighting it.

What we do

Framing & structural carpentry work in Milton

Framing Carpenter in Milton

  • Additions & second storeys

    Floor systems, walls and roofs framed to the engineer's drawings, squared and plumbed so every trade after us has an easy time of it.

  • Roof trusses & rafter framing

    Trusses set, braced and tied down to the truss supplier's layout, or a stick roof cut on site where trusses will not fit the design.

  • Load-bearing wall removal

    Walls opened up with a properly sized beam, temporary shoring built first, and the point loads carried right down to the footing.

  • Basement framing & underpinning support

    Basement suites and legal egress framed to plan, including the shoring and temporary support that underpinning and bench footing need.

  • Decks, porches & pergolas

    Footings below the frost line, proper ledger flashing and guard heights, built to the permit drawings and ready for inspection.

  • Garages & accessory structures

    Detached garages, shops and garden suites framed and sheathed, from slab to roof deck, with the sheathing nailing pattern the inspector will check.

  • Sagging floors & structural repair

    Bouncy floors, cracked joists, rotted sills and cut-through beams sistered, jacked and repaired instead of shimmed and hidden.

  • Framing inspection walkthroughs

    We meet the inspector at framing stage, deal with anything flagged, and get the job signed off before insulation and drywall go on.

Questions

Asked and answered

Is this wall load bearing?

The honest answer is that nobody can tell you for certain from a photo. What we look for is whether the joists above run across it or parallel to it, whether there is a beam or a wall directly below it in the basement, and whether it sits under a bearing point from the roof. We check from below and above before quoting, and anything structural gets an engineer's beam size before a single stud comes out.

Do I need a permit and an engineer?

For additions, structural alterations, removing a load-bearing wall, and most decks over a certain height, yes to the permit — and structural work almost always needs a stamped drawing to get one. We can work from your designer's drawings or point you to an engineer we work with. Framing without a permit is the thing most likely to surface at resale and cost far more to fix retroactively.

How long does framing take?

A typical addition is framed and sheathed in one to three weeks once the foundation is ready and the trusses are on site. Truss lead times are usually the long pole in the schedule, not the framing itself, so we get the truss order in as early as the drawings allow. Weather moves dates and we tell you when it does.

My floor bounces. Is that a structural problem?

Sometimes, often not. Bounce usually means joists at their span limit rather than joists failing, and it is often fixed with blocking, a strongback or a mid-span beam. Real problems look different: a visible sag, cracked or split joists, a beam notched through for plumbing, or rot at the sill where the framing meets the foundation. We look before assuming either.

Can you build a deck without concrete footings?

Not one that will pass or last here. Footings have to sit below the frost line or the deck lifts and drops every winter until the ledger tears at the house. There are approved systems beyond poured piers, but they all reach proper depth or bearing. Anyone offering to set posts on blocks on the ground is building you a problem.

Service area

Where we work

  • Milton

Hours

Monday
7 am – 5 pm
Tuesday
7 am – 5 pm
Wednesday
7 am – 5 pm
Thursday
7 am – 5 pm
Friday
7 am – 5 pm
Saturday
8 am – 1 pm
Sunday
Closed

Book online

Pick a time that suits you

Choose a slot and we will confirm it. No account, no waiting on hold.

Book a visit

Pick a time that works. Takes about 30 seconds.

October 2026
SMTWTFS

Contact

Tell us about the job

Name and phone number are all we need to start.

Address
Milton
Reply
Same day where we can

A photo of the problem saves a trip. Optional.

Studline Framing — Framing Carpenter demo on Quiet | TradeForge