General Contractor · Milton
Renovations & builds in Milton
Kitchens, bathrooms, basements and additions run on a written schedule with permits pulled. Bramford Contracting will give you one point of contact from demolition to final inspection.
Serving Milton
- Fixed-price contracts
- Permits handled
- WSIB & $5M insured
- LicensedLicence 7A-89377
- Response timeSame day where we can
- Serving Milton since 2018
About us
About Bramford Contracting
8Years of experience
Bramford Contracting runs renovations the way clients wish more contractors did: a written scope, a real schedule, one person answering the phone, and change orders priced before the work happens. We pull the permits, we verify our subtrades' insurance, and we clear the deficiency list before asking for the final payment. Renovating is disruptive enough without also being a mystery.
What we do
Renovation services in Milton
Kitchens, bathrooms, basements and additions run on a written schedule with permits pulled. Bramford Contracting will give you one point of contact from demolition to final inspection.
Kitchen renovations
Full kitchen rebuilds with the plumbing, electrical, cabinetry and countertop trades sequenced so nobody is waiting on anybody.
Bathroom renovations
Down to the studs, waterproofed properly behind the tile, vented correctly, and rebuilt with the fixtures you chose rather than what was in stock.
Basement finishing
Permitted basement builds with insulation, egress, ceiling height and fire separation done to code — including legal secondary suites.
Additions & second storeys
Structural additions from drawings and permits through framing, envelope and finishes, with the house kept weather-tight throughout.
Structural changes & wall removal
Load-bearing walls opened up with engineered beams, proper temporary shoring and an engineer's letter for the file.
Whole-home renovations
Gut renovations run on a real schedule with one point of contact, so you are not project-managing eight subtrades from your phone.
Permits, drawings & approvals
Design drawings, permit applications and inspection scheduling handled for you, including the ones people forget until the inspector arrives.
Garages, decks & exterior builds
Detached garages, garage conversions, decks and porches built on proper footings and permitted where the municipality requires it.
Looking for help in Milton?
Same day where we can response on new enquiries.
Credentials
Licences & certifications
The paperwork behind the work at Bramford Contracting.
- Red Seal General CarpenterCertificate of Qualification in general carpentry with Red Seal endorsement.
- RenoMark memberRenovator member committed to the RenoMark code of conduct: written contracts, warranty and insurance.
- $5M liability insuranceCertificate of insurance provided before the contract is signed.
- WSIB clearance for every subtradeWe verify clearance for our subcontractors too, so liability never lands on you.
- BCIN designer on our teamPermit drawings prepared by a qualified designer with a Building Code Identification Number.
- Written workmanship warrantyTwo-year workmanship warranty stated on the contract, separate from product warranties.
Questions
Frequently asked
If your question isn't here, call us — we would rather explain it than have you guess.
Fixed price when the scope is clear and the selections are made; you carry no risk on labour overruns and can compare quotes properly. Cost plus makes sense on gut renovations and older houses where nobody knows what is behind the walls yet, as long as the markup and the reporting are written down. We will tell you which one your project actually is instead of defaulting to whichever suits us.
Yes, and we schedule the inspections. Structural work, new plumbing and electrical, basement suites, additions and decks over a certain height all need permits. Skipping them saves a few weeks now and creates a disclosure problem the day you sell — plus insurers can and do deny claims on unpermitted work.
A bathroom is typically three to five weeks on site, a kitchen six to ten, assuming selections are finalised before demolition. The single biggest cause of delay is decisions made mid-project: a cabinet or tile changed after ordering can cost more time than the whole demolition. We give you a decision deadline schedule up front.
For a single room, usually yes — we dust-wall the work area, keep one bathroom and the kitchen usable where possible, and work regular hours. For a gut renovation or anything without heat, water or a working bathroom, plan to move out. We will tell you honestly which one yours is at quoting, not in week three.
Anything outside the signed scope gets priced in writing and approved by you before it is done — no verbal extras, no surprises on the final invoice. Some changes are ours to absorb because we missed them; some genuinely could not be known until the wall was open. The contract spells out which is which.
A deposit to hold the schedule and order materials, then progress payments tied to completed milestones rather than dates, and a holdback until the deficiency list is cleared. Be wary of anyone asking for a very large share up front — that is the most common warning sign in this trade.
Service area
Where we work
Bramford Contracting covers these communities.
- Milton
Office hours
- Monday
- 7 am – 5 pm
- Tuesday
- 7 am – 5 pm
- Wednesday
- 7 am – 5 pm
- Thursday
- 7 am – 5 pm
- Friday
- 7 am – 5 pm
- SaturdayToday
- 8 am – 1 pm
- Sunday
- Closed
Book online
Pick a time that suits you
Choose a slot and we will confirm it. No account, no waiting on hold.
Book a visit
Pick a time that works. Takes about 30 seconds.
Contact
Request a quote
Tell us what you need and we will get back to you with a straight answer.
- Phone
- (905) 555-0112Same day where we can response
- Address
- Milton
Send us the details
Name and phone number are all we need to start.